The application of the value engineering method in the Construction of the Integrated Hajj and Umrah Service Headquarters of the Ministry of Religion, Batang Hari Regency, is reviewed in terms of architectural work, namely by reviewing the use of materials in Floor, Ceiling, Roofing, Sills work. Value engineering can be viewed in terms of materials or materials, implementation methods and implementation time. 222/KPTS/CK/1991, the Directorate General of Human Settlements stated that buildings with a value of over 1 billion must be carried out a Value Engineering analysis. In accordance with the regulation of the Ministry of Public Works No. Value Engineering (VE) or in Indonesian called Value Engineering is a method that analyzes the problems of a project through a systematic and organized approach by eliminating unnecessary costs without reducing the function, appearance, quality and reliability of the project.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |